Specifications

Project NameSea Horizon
DeveloperHao Yuan Development Pte Ltd
ArchitectTBA
Site Area27,660 sqm/297,732.24 sqft
No. Of Units495 Residential Units
District18
Tenure99 years commencing on 25 Feb 2013
Expected TOP25 November 2016
CarparkTBA
Unit Types
  • 2-bedroom: 71 to 80 sqm (22 Units)

  • 3-bedroom: 96 to 126 sqm (187 Units)

  • 4-bedroom: 116 to 129 sqm (168 Units)

  • 5-bedroom: 138 to 150 sqm (92 Units)

  • Garden Duplex: 160 sqm (5 Units)

  • Penthouse: 129 to 160 sqm (21 Units)
  • SPECIFICATIONS
    1 FOUNDATION
    Piled foundation and/or other approved foundation system.

    2 SUPERSTRUCTURE
    Reinforced concrete and/or steel structure.

    3 WALLS
    a) External :
    – Reinforced concrete and/or pre-cast reinforced concrete and/or masonry.
    b) Internal :
    – Masonry and/or cast in-situ reinforced concrete wall and/or pre-cast reinforced concrete wall and/or light weight concrete block and/or drywall partition.

    4 ROOFS
    Reinforced concrete roof and/or structural steel roofing system with appropriate insulation and waterproofing system.

    5 CEILING
    a) Unit
    i) Living, Dining, Bedrooms
    • Skim coat with paint finish and/or bulkhead (Where applicable).
    ii) Hallway to Bedrooms/ Entry to Living, Kitchen, Bathroom, WC, Private Enclosed Space (PES) and Balcony (where applicable).
    • Ceiling board and/or ceiling box-up and/or cement/ sand plaster and/or skim coat with paint finish and/or bulkhead (where applicable) to designated area.

    b) Common area
    i) 1st storey lift lobby to 13th storey lift lobby
    • Ceiling board and/or skim coat and/or cement/ sand plaster with paint finish.
    ii) Carpark, Ramp and staircase
    • Skim coat and/or cement/sand plaster with paint finish and/or bulkhead (where applicable).

    6 FINISHES
    a) Wall
    i) Unit
    • Living, Dining, Bedrooms, Hallway to Bedrooms
    – Paint finish to exposed surface only.
    • Bathroom, Powder room
    – Tile to designated exposed surface below false ceiling.
    • Ktchen, WC
    – Tile and/or skim coat and/or cement/sand plaster with paint finish (up to false ceiling and at designated exposed areas only).
    • Private Enclosed Space (PES), Balcony, Planter and Roof Terrace
    – Cement/sand plaster and/or skim coat with paint finish.
    ii) Common Area
    Internal Wall
    • 1st storey lift lobby and 2nd storey lift lobby:
    – Stone and/or tile and/or cement /sand plaster and/or skim coat with paint finish
    • 3rd to 13th storey common lift lobby
    – Cement/sand plaster and/or skim coat with paint finish.
    • Common Corridor, Staircase and Carpark
    – Cement/sand plaster and/or skim coat with paint finish.
    External Wall
    • All external Walls including Roof Terrace, Balcony and Private Enclosed Space (PES)
    – Cement/Sand plaster with emulsion and/or spray textured paint.

    b) Floor
    i) Unit
    • Living, Dining, Kitchen, Bathrooms, Powder room, Entrance Foyer, WC, Hallway
    – Tile with skirting
    • Bedrooms
    – Timber flooring with skirting.
    • Private Enclosed Space (PES), Balcony, Roof Terrace
    – Tile and/or cement/sand screed to Architect’s design.
    • A/C Ledge
    – Cement/sand screed.
    ii) Common Area
    • 1st storey lift lobby to 13th storey lift lobby
    – Stone and/or tile and/or cement/sand screed.

    7 WINDOW
    i) Unit
    • All windows of the apartment shall be aluminium framed window with glass.

    8 DOORS
    i) Unit
    • Main Entrance
    – Approved fire-rated timber door
    • Bedrooms, Bathrooms Powder room
    – Hollow core timber swing door and/or sliding door.
    • Kitchen
    – Timber and/or aluminium framed sliding door and/or swing door and/or slide and fold door to Architect’s design (where applicable).
    • WC
    – Swing door and/or slide and fold door to Architect s design (where applicable).
    • Balcony, Terrace and Roof Terrace, Private Enclosed Space (PES)
    – Aluminium framed sliding and/or swing door and/or slide and fold door

    9 SANITARY FITTINGS
    a) Master Bath
    • 1 shower compartment complete with shower mixer set
    • 1 water closet
    • 1 vanity top complete with 1 countertop basin and 1 basin mixer
    • 1 mirror
    • 1 tower rail
    • 1 toilet paper holder

    b) Common Baths (where applicable)
    • 1 shower compartment with shower mixer
    • 1 water closet
    • 1 vanity top complete with 1 countertop basin and 1 basin mixer
    • 1 pedestal wash basin with 1 basin mixer
    • 1 mirror
    • 1 tower rail
    1 toilet paper holder

    c) Powder Room (where applicable)
    • 1 water closet
    • 1 vanity top complete with 1 countertop basin and 1 basin mixer
    • 1 pedestal wash basin with 1 basin mixer
    • 1 mirror
    • 1 tower rail
    • 1 toilet paper holder

    d) WC (where applicable)
    • 1 water closet
    • 1 shower set
    • 1 toilet paper holder

    e) Kitchen(where applicable) or Yard (where applicable)
    • 1 washing machine bib tap

    f) Private Enclosed Space (PES) or Roof Terrace (where applicable)
    • 1 cold water bib tap

    10 ELECTRICAL INSTALLATION
    a) Wiring for lighting and power shall be concealed conduit except for spaces within DB’s closet and area above false ceiling, which shall be exposed conduit/trunking.
    b) See Electrical Schedule for details.

    11 CABLE TV AND TELEPHONE POINTS
    TV/telephone points shall be provided in accordance with the Electrical Schedule.

    12 LIGHTNING PROTECTION SYSTEM
    Lightning Protection System shall be provided in accordance with SS555:2010.

    13 PAINTING
    a) External Wall
    • External emulsion painting and/or spray textured paint coating.
    b) Internal Wall
    • Emulsion paint.

    14 WATERPROOFING
    Waterproofing shall be provided to floor of Bathroom, Kitchen, WC, Private Enclosed Space (PES), Balcony, Roof Terrace, Reinforced Concrete (RC) Roof, Planter, Swimming Pool and other Pools, Swimming Pool Pump Room, Landscape Deck, Basement Carparks (where applicable).

    15 DRIVEWAY AND CARPARK
    a) Surface driveway
    • Concrete/stone paver and/or tile and/or pre-mix and/or concrete floor and/or Grass-cell pavers to external driveway at designated areas.
    b) Carpark and ramp to basement Carpark
    • Reinforced concrete slab with floor hardener.

    16 RECREATIONAL FACILITIES
    a) Swimming Pool – lap pool & free-form pool with pool side deck
    b) Children’s Wading Pool
    c) Dip Pool
    d) Spa
    e) Plaza – with BBQ facilities 0 Outdoor Lounge Deck
    g) Poolside Pavilion
    h) BBQ/Grill Pavilion
    ) Children Play
    j) Tennis Court
    k) Outdoor Fitness Stations
    l) Themed Gardens
    m) Sky Clubhouse – Gym, Dining and Lounge Areas

    17 OTHER FACILITIES
    Management Office & Guard House.

    18 ADDITIONAL ITEMS
    a) Kitchen Cabinets and appliances
    • Solid surface countertop complete with high and low level kitchen cabinet and stainless steel sink with kitchen tap, cooker hob, hood and built-in microwave.
    b) Bedroom wardrobe
    • Built in Wardrobe.
    c) Water heater
    • Hot water supply shall be provided to all Bathrooms (EXCEPT WC, kitchen, powder room)
    d) Security System
    • Audio Intercom System to Apartment Units. • Card Access to pedestrian gate. • Carpark Barrier System at main entrance near Guardhouse. • Closed Circuit Television System (CCTV) general surveillance to ground storey lift lobby and designated common areas.
    e) Gas supply
    • Town gas is supplied to units with Gas Burner hob and gas heater.
    f) PES fencing
    • Metal railing and/or fixed glass panel and/or planter and/or brick wall with plaster and paint and/or reinforced concrete (RC) with gate to Architect’s design.
    g) Balcony and Roof Terrace
    • Metal Railing and/or fixed glass panel and/or reinforced concrete (RC) balustrade to Architect’s design.
    h) Air-Conditioning
    • Wall mounted fan coil unit air-conditioning system to Living/Dining, and Bedrooms.

    NOTE:
    1) Air-Conditioning System

    To ensure good working condition of the air-conditioning system, the system has to be maintained and cleaned on a regular basis by the Purchaser. This includes the cleaning of filters, clearing of condensate pipes and charging of gas. The Purchaser is advised to engage his/her own contractor to service the air-conditioning system regularly.

    2) Mechanical Ventilation System
    Mechanical Ventilation fans and ductings are provided to toilets which are not naturally ventilated. To ensure good working condition of the mechanical ventilation system, the mechanical ventilation system for the exhaust system within internal toilets (where applicable) is to be maintained by the Purchaser on a regular basis.

    3) Television and/or Internet Access
    The Purchaser is liable to pay annual fee, subscription fee and such other fees to the television and/or Internet Service Providers or any other relevant party or any relevant authorities. The Vendor is not responsible to make arrangements with any of the said parties for the service connection for their respective channels and/or internet access.

    4) Warranties
    Where warranties are given by the manufacturers and/or contractors and/or suppliers of any of the equipment and/or appliances installed by the Vendor at the Unit, the Vendor will assign to the Purchaser such warranties at the time when possession of the Unit is delivered to the Purchaser. Notwithstanding this assignment, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clausel 7.

    5) Layout/Location of Wardrobes, Kitchen Cabinets, Fan Coil Units, Electrical Points, Door Swing Positions and Plaster Ceiling Boards.
    Layout/Location of wardrobes, kitchen cabinets, fan coil units, electrical points, audio intercom system, door swing positions, plaster ceiling boards are subject to Architect’s final decision and design.

    6) Materials, Fittings, Equipment, Finishes, Installations and Appliances
    Subject to clause 14.3, the brand, colour and model as specified for all materials, fittings, equipment, finishes, installations and appliances to be supplied shall be provided subject to Architect’s selection and market availability.

    7) False Ceiling
    The false ceiling space provision allows for the optimal function and installation of M&E services. Access panels are allocated for ease of maintenance access to concealed M&E equipment for regular cleaning purposes. Where removal of equipment is needed, ceiling works will be required. Location of false ceiling is subject to the Architect’s sole discretion and final design.

    8) Glass
    Glass is manufactured material that is not 100% pure. Invisible nickel sulphide impurities may cause spontaneous glass breakage, which may occur in all glass by all manufacturers. The Purchaser is recommended to take up home insurance covering glass breakage to cover this possible event. Notwithstanding this note, the Vendor shall remain fully responsible for the performance of its obligations under clause 9 and clause 17.

    Developer : Hao Yuan Development Pte Ltd (RCB : 2012299444• Developer’s License No : C1079 dated 15 July 2013 Tenure of Land : 99 years from 25 February 2013• Mukim/Lot No : Lot 4838K of Mukim 31, Singapore• Building Plan No : A1698-00350-2013-BP01 dated 10 July 2013• Planning Approval No : P280113-24C2-Z000 dated 17 Jun 2013• Project Account No : MALAYAN BANKING BERHAD FOR PROJECT ACCOUNT NUMBER 04011503676 FOR HAO YUAN DEVELOPMENT PTE LTD •Expected Date of Vacant Possession : 25 November 20160 Expected Date of Legal Completion : 25 November 2019

    Whilst reasonable care has been taken to ensure accuracy in the preparation of information in this website, no warranty is given and interested parties should rely on the sale and purchase agreement. Visual representations including models, drawing, illustrations, photographs and art rendering (the -Visual Representation-) portray artistic impressions only. The information contained herein, the fitting, finishes, features and other display in the show units or elsewhere (the -Materials”), which are for the general guidance only, are subjected to change and should not be relied upon as accurately describing any specific matter. Photographs, including those taken in the show units do not necessarily represent as built standard specifications. Floor areas are approximate measurements and are subjected to final survey. The Vendor reserves the right to modify features, any unit, plans, the development or any part thereof as may be approved or required by the relevant authorities. The Visual Representation and the Materials shall not constitute a warranty or representation of fact and cannot form part of an offer or contract in respect of any unit in the development, The Vendor shall not be bound by any statement, representation or promise (whether written or oral) by vendor’s agent or otherwise with respect to the development and/or any unit, except as expressly set forth in the sale and purchase agreement. The sale and purchase agreement shall form the entire agreement between the vendor and purchaser and shall in no way be modified by any statement, representation or promise (whether or not contained in the visual representations, and/or the Materials and/or by the Vendor’s agent or otherwise) made prior to the signing of the sale and purchase agreement.